This carefully and perfectly constructed column was destroyed by, well, by my left big toe.
I caught the level string between toe and Havaiana and demolished the whole damn thing....Fabino and I kept creasing up for a good half hour after.
This is a mosquito I slaughtered. That's it, really.
This is just in case you'd forgotten, as I had, that I have a lovely mezzanine.
I finally ordered the welded steel spiral staircase ( extra wide) and balustrade the other day. Then I'm having french window like doors put in to the ouside wall, and a guard rail, so it's like a not quite a balcony. It'll be a nice spot though, with a view of the street and so on.
I realised I'm going to have to clad the inside of the entire roof too, as the place is filthy within twelve hours of cleaning, and with high winds, burnt off plant waste gets blown between the tiles and the place looks like a bomb site in a few minutes.
So those two things, plus the perimeter fence, are pretty much the last big jobs on the menu.
oh and a couple more guest units....but I have some freaky ideas for those hehehehehhe.
More later.

No comments:
Post a Comment